Virtual power plant

Turn scattered resources into one response event

Loads, storage, distributed generation and chargers register as flexible resources. MeetCarbon Cloud runs an event from invitation through bidding, execution, verification and settlement. On-site control systems stay with the owner.

See how devices connect
1
Resources to settlement
2
Soft and hard commands
Core
Demand response
Peak-shave event · sample site
Sample
Midday peak shave
11:00–13:00
Window deviation
−12%
BaselineActual
Window
11:00–13:00
Execution
Soft command
One event

From resources to payout, on one chain

After an invitation arrives, assessment, bidding, execution, verification and settlement stay on the same record.

  1. 1

    Onboard

    Customers, sites and flexible resources enter the pool.

  2. 2

    Invite and bid

    Size the capacity, confirm with customers, then file the bid.

  3. 3

    Monitor

    Dispatch the plan and watch the curve against deviation.

  4. 4

    Verify

    Score the response and performance against a baseline.

  5. 5

    Settle

    Match the market statement and split aggregator and customer shares.

Scope

The main chain finishes the event. Rules and records sit beside it

Operations move event by event. Market rules, interface quality and the audit trail stay on the same files.

Operating chain
  1. 01

    Resource center

    Customers, sites and meters, plus loads, storage, generation and chargers, as flexible capacity.

  2. 02

    Invitation and bid

    Receive an invitation, check reachable capacity and conflicts, then validate and submit the bid.

  3. 03

    Clearing and plan

    Take the clearing result and split the target across customers, resources and strategies.

  4. 04

    Execution watch

    Send commands and keep the curve, deviation and alarms on the event.

  5. 05

    Verification

    Manage baselines, calculate the response and produce the performance pack.

  6. 06

    Settlement

    Reconcile the market statement and assessment, then split shares and issue statements.

Alongside

Markets and rules

Configure products, assessment and bid checks. Demand response is the current main line.

Alongside

Operations and trace

Interface status, data quality and key actions stay reviewable for the shift and for audit.

How it runs

Soft commands first. Hard commands open resource by resource

Both can exist together. Today the usual path is to notify the customer or the on-site system. Automatic control turns on only after authorization and a passed control test.

Soft command

Default today

The platform builds the plan, notifies the customer or on-site system, then collects the curve.

Fits the first demand-response events and a customer joining for the first time. The responsibility line stays clear.

Hard command

Per resource

On a locked plan, the platform sends control to the on-site system or device and takes the result back.

Fits resources that are authorized, tested, and expected to respond faster.

Three checks before hard control

Two-person review

Dispatch, plan lock and batch control need a second confirmation.

Allowed hours

Commands go out only in the hours the customer authorized. Production blackout hours stay off.

One-step rollback

A command can be withdrawn, with the drill and the action kept on record.

Hard control also needs a signed authorization, a passed device test and acceptable meter quality. Until then the resource stays on soft commands.

Market products

Finish demand response first

Other products open with provincial rules and the required system connection. Status is marked separately.

  • Demand response

    Main line

    Peak shaving and valley filling, on an hourly scale. Invitation through verification runs on this line.

  • Peak regulation

    Partial

    Hourly ancillary service, enabled per project once dispatch-side conditions are met.

  • Frequency regulation

    Later

    Seconds to minutes. It depends on dispatch access and hard control.

  • Reserve

    Later

    Minute-scale ancillary service, scheduled with dispatch access.

  • Spot

    Later

    Energy trading, 15 minutes to an hour, after node and market rules are in place.

  • Forward

    Later

    Monthly and annual energy, assessed against the trading rules on their own.

One resource binds to a single virtual power plant. Bids check that it is not aggregated twice.

Who uses it

The aggregator runs the event. The customer confirms. Finance reconciles

A regional desk sees the roll-up. Each role stays inside its own customers, events and statements.

Invite to settlement

Aggregator ops

  • Assess invitations and file bids
  • Split plans and watch execution
  • Review verification and shares
Own resources

Customer

  • Register resources and confirm strategy
  • Accept or decline an invitation
  • See execution and revenue
Across aggregators

Regional desk

  • See regional flexible capacity
  • Review compliance
  • Roll up statistics without editing operations
Statements and records

Finance and audit

  • Match the market statement
  • Open customer bills
  • Read the action log
Boundary

The platform orchestrates the event. On-site control stays in the customer system

The virtual power plant covers onboarding, orchestration, monitoring, verification and settlement. The items below stay where they are and connect in.

FAQ

Align these before joining an event

How do the virtual power plant and energy management split the work?

Energy management runs day-to-day usage, analytics and reports. The virtual power plant runs how flexible resources join an event: invitation, bid, execution, verification and shares. Both can use the same meter points.

Can we join demand response without automatic control?

Yes. A soft command notifies the customer or the on-site system, they confirm execution, and the platform monitors and verifies. Hard commands open per resource after authorization, a control test and a rollback drill.

Are frequency regulation and the spot market available now?

Demand response is the current main line. Peak regulation is partial, per project. Frequency regulation, reserve, spot and forward markets need dispatch or trading access, and are called out before they open.

Can one device serve two aggregators at once?

No. A resource binds to one virtual power plant. Bids check for a second aggregation.

How does revenue reach the customer?

The market statement and assessment are matched first, then split to the aggregator and the customer by the configured rules, with a reconciliation. Rule changes stay on record.

See whether the resources you have can join

Tell us the resource types, the province and how control works today. We will demo and say how far an event can go.