Smart pole

One pole, one file, lighting, charging and mounts on one screen

MeetCarbon Cloud smart poles keep a file for each comprehensive, street and landscape pole, switch and dim by group, and put energy, alarms, work orders and mounted services on one map. Charging orders settle in charging operations. This product keeps the pole-to-charger link and the overview.

One file
Pole, bays and mounts
Group dimming
Policy down to the lamp
Alarm to ticket
From exception to close
Split books
Charging, ads, sites, EMC
Smart lighting map
Sample data
128
Poles online
97%
Lights on
5
Open alarms
86k
Month share
Open
  • Arterial group A · lamp controller offlineDispatch
  • Binjiang pole 12 · dimming policy waitingDim
  • EMC March settlement · waiting confirmConfirm
How it runs

From a pole file to a settlement you can check

Four steps match the screens already in the product. After the pole is filed, dimming, alarms and sharing stay on that pole.

  1. 01

    File

    Enter the code, type, district, height and bays, and hang lamps, chargers, screens and sensors on this pole.

    Pole file · Map
  2. 02

    Control

    Switch and dim by arterial, secondary, local or landscape group. Scenes cover everyday, holiday, event and emergency full-on.

    Lighting console
  3. 03

    Tickets

    Offline, faults and threshold breaches become alarms. Inspection or repair tickets move from open to closed, with SLA.

    Alarms · Tickets · Rules
  4. 04

    Share

    Charging, advertising, site rent and EMC savings each post on their own line. Savings follow the confirmed sheet.

    Energy · EMC · Sharing
Product tour

What you see in smart poles

The menu groups poles and lighting, energy contracts, operations and mounts. These match the screens already in place. Open any item to see the work it does.

MeetCarbon Cloud · Smart pole / Map

Map

Poles and lighting
Tabs
OnlineLightsAlarmsShare
What it does

See poles online, the share of lights on, open alarms and this month’s sharing, and open a pole or an alarm from here.

  • Poles, lamps and alarms on one screen
  • Districts can be opened
  • Figures are samples; the ledger is the record
Sample screenOnline
128
Online
97%
Lights on

Pole counts, uptime, kilowatt-hours and amounts in the sample windows only show how the screen is organised.

Scene kits

The same pole, mounts chosen by scene

Decide what this pole has to do, then open the matching screens. These four combinations can already be registered and viewed.

Choose a scene
Mounts included
Smart lightingPer-lamp meteringAC charger mountRoof PV auxiliary
What this page owns

The pole, dimming, energy and charger online status live here. Orders, prices and invoices live in charging operations. Roof PV covers low-voltage, communications and part of the lighting. The charger’s main supply is metered on its own.

Two-wheel charging has no menu of its own. Orders and tariffs are handled in charging operations. The pole side keeps the mount link.

Dimming sample

Move the brightness, see the sample kilowatt-hours

One sample lamp shows the gap between dimmed and full brightness. Confirmed savings use the EMC settlement sheet.

Brightness80%

Sample: 120 W rated, 10 hours on

Full-on energy
1.20kWh
Energy at this brightness
0.96kWh
Sample saving
0.24kWh

The sample scales energy by brightness only. It leaves out lumen depreciation, voltage and group policy. External savings use a confirmed EMC sheet.

Who uses it

Dispatchers run the lamps, crews close tickets, settlement reads the sheet

The lead reads the map and whether a split is confirmed. Dispatch sends policy. Crews handle alarms and tickets. Settlement reads four income lines.

The question

Are tonight’s lights and mount income in order?

What they open
  • Poles online and lights on
  • Open alarms
  • Whether this month’s share is complete
Usual screens
MapSharingEMC
Where data enters

The ledger, the meter and the mounts meet on one pole

Every mount has to match a pole. Charging bills are not rebuilt here. Device reads and writes go through the IoT base.

Pole ledger
Enter code, type, district, height and bays by hand. That file is the start.
ComprehensiveStreetLandscape
Per-lamp meter
The controller reports switch, brightness and energy for the console, the energy page and EMC.
IoT base
Lamp controllers, sensors, screens and security devices enter through one IoT base. This page consumes status and readings.
Charging write-back
The charger-to-pole link is read here. Orders, prices and invoices stay in charging operations.
EMC baseline
Contract baseline energy is entered per project and compared with measured energy before confirm.
What stays in the neighbouring product
  • Charging orders, prices, payment and invoices stay in charging operations.
  • Protocols and thing models stay in the IoT base.
  • Video pictures come from the security platform or the IoT base.
  • Organisation energy hosting and building sub-meters stay in energy management.

Lighting savings and charging income on the same pole post on separate lines, so an EMC sheet and a charging share do not share a row.

Go-live

File the poles and groups first, then add mounts

Do the first road in this order. Charging tariffs and IoT protocols can be prepared in parallel. The pole ledger can start first.

Before you start
  • 1Pole locations, codes and types
  • 2Groups: arterial, secondary, local or landscape
  • 3The list of lamps, chargers, screens or sensors to mount
  • 4For EMC: baseline energy and contract mode
  • 5Charging prices stay configured in charging operations

If the factor is missing, the carbon board has no reduction yet. You can still create poles and policy.

  1. 1

    Create the ledger

    Enter poles, districts and bays.

    You getOne file per pole
  2. 2

    Connect lamp control

    Put controllers in a group and confirm switch and brightness.

    You getLighting console
  3. 3

    Send policy

    Enable an everyday or emergency scene.

    You getGroup policy
  4. 4

    Connect alarms

    Offline and faults become alarms, and tickets when needed.

    You getA closed loop
  5. 5

    Mount services

    Link chargers, screens, sites or sensors.

    You getMount ledger
  6. 6

    Settle

    Confirm the EMC sheet and read the four share lines.

    You getA book you can check
Platform

Assets, policy, alarms and sharing stay on one ledger

Smart poles own the pole and the mount layout. Charging operations, device access, PV monitoring, carbon assets and ESG each have their own product.

One file per pole

Type, district, height, bays and mounts sit on the same file.

Group policy

Brightness, scene and enabled state go out by road section and can be turned off.

Alarm to ticket

An open alarm can become inspection or repair, with an SLA.

Four share lines

Charging, ads, site rent and EMC savings post by party and period.

Three contracts

Shared, guaranteed and hosted each keep baseline, actual and confirm.

Mounts can be added

Lamps, chargers, screens, sites, security, environment and city services hang on the pole.

Questions

Settle the pole and the billing boundary first

How do smart poles and charging operations split the work?

This page records which pole a charger hangs on, and shows online status plus a share overview. Orders, prices, payment and invoices are completed in charging operations.

How does this split from the IoT base?

Protocols, thing models and device access live in IoT device management. Smart poles consume online status, brightness and sensor readings, and run group policy, alarms and tickets.

Can the security page play video?

The security page counts whether cameras, help points and broadcast are online, and joins linkage. The video stream comes from the security platform or the IoT base.

Can the pole counts and amounts on this page be cited?

Do not cite them directly. Figures on the map, the dimming bar and the share cards explain the layout. External use takes the ledger, a confirmed EMC sheet, and orders in charging operations.

Can the roof PV supply the charger?

Roof PV is auxiliary power for low-voltage, communications and part of the lighting. The charger’s main supply is metered separately and posts apart from lighting savings.

Do EMC shares and charging income land on one line?

They post separately. EMC confirms savings as baseline energy minus measured energy. Charging, ads and site rent each have their own line on the sharing ledger.

Start by fixing the poles and groups on one road

Tell us whether this is roadside light-and-charge, an information screen, security linkage, or street-light EMC. We will walk through the ledger, dimming, alarms and sharing for that scope.