Energy storage operations

Charge, SOC and revenue, on one operations desk

MeetCarbon Cloud energy storage operations covers commercial and behind-the-meter storage: multi-site control, charge and discharge strategy, safety alarms, demand-response and frequency-regulation events, plus energy and revenue reports. Device protocols land in IoT or a gateway. This product runs operations, dispatch and accounting.

Multi-site
One desk, compared sites
4 types
Arbitrage, DR, regulation, capacity
4 levels
Alarms from critical to info
PCS / BMS
Racks filed by device type
Storage overview
Sample data
68%
Site SOC
320
Live power
kW discharge
Charge today1,860kWh
Discharge today1,640kWh
Revenue mix
  • Arbitrage62%
  • DR18%
  • Regulation12%
  • Capacity8%
Alarms to confirm
  • Cabinet 2 · rack temperature spreadMajor
  • PCS-03 · comms lost for 6 minMinor
Full path

From connection to the ledger, along the same site

Six steps match the menus in the product. Collection stays on the device side. Strategy, alarms and revenue stay here.

  1. 01

    Connect

    Create the site, attach PCS, BMS and battery racks, and pick drivers and points.

    Sites · Drivers
  2. 02

    Monitor

    Read topology, operating state, live points and online status.

    Site control · Asset register
  3. 03

    Dispatch

    Set a peak-valley or demand strategy, pass protection checks, then send it and keep the receipt.

    Dispatch strategy
  4. 04

    Safety

    Grade, confirm, suppress and score alarms in one loop.

    Safety alerts
  5. 05

    Events

    Record demand-response and frequency-regulation execution and settlement.

    Event center
  6. 06

    Revenue

    Publish charge and discharge, revenue by type, and the split.

    Reports
Product tour

What you open in storage operations

The list groups running, dispatch and safety, and revenue and intelligence. Pick a module to see its tabs and what it does.

MeetCarbon Cloud · Storage / Overview

Overview

Running
Tabs
SOC and powerCharge and dischargeRevenue mixAlarms
What it does

The home view rolls up SOC, live power, today’s energy and the revenue mix across sites, and lists alarms waiting for confirmation.

  • Multi-site metrics on one screen
  • Revenue split into arbitrage, DR, regulation and capacity
  • Higher-severity alarms surface first
Screen sampleSOC and power
SOC68%
Live power320 kW discharge
Today charge / discharge1,860 / 1,640
Arbitrage share62%

Tab names follow the product menus. Figures on this page are samples, not a site’s operating results or revenue.

Operating states

Sites, devices and alarms each have their own states

Site lifecycle, device online status and alarm severity are recorded separately. Control and high-risk actions stay on operating sites.

Site

Which stage the site is in.

  • Under construction
    Records and topology can be edited; strategy is not sent yet
    site
  • Operating
    Monitoring, strategy and revenue are all on
    site
  • Maintenance
    Alarms can be suppressed; control needs a separate grant
    site

Device

Whether communications are still live.

  • Online
    Points are refreshing
    device
  • Offline
    No report past the threshold, and an alarm opens
    device

Alarm

From critical to info, the response differs.

  • Critical
    Confirm first; protection can follow
    level
  • Major
    Handle the same day
    level
  • Minor
    Fold into inspection
    level
  • Info
    Record only
    level

9 statesOffline thresholds and severity follow site configuration. This page only shows how the product separates states.

Who uses it

Each role opens a different door

The same site data: operations reads revenue, maintenance reads alarms, dispatch reads strategy receipts.

The question to answer

How are SOC, energy and revenue today, and which strategy needs approval?

What they check
  • Multi-site overview
  • Revenue by type
  • Strategy approval
Modules they use
OverviewRevenue reportsDispatch strategy
Peak-valley sketch

See the spread before deciding how much to charge

Move charge, planned discharge, valley price, peak price and round-trip efficiency. Counted discharge cannot exceed charge times efficiency.

Counted discharge = min(planned discharge, charge × efficiency). Efficiency is read as a combined round-trip figure.

Illustrative spread is positive
1,148CNY
Counted discharge
1,760 kWh
Discharge income
1,848
Charge cost
700
Spread
1,148

This calculator only sketches energy and price. It does not forecast tariffs and it is not investment advice. Actual revenue also includes demand charges, losses, service fees and the split.

Dispatch loop

From strategy to the ledger, in one record

The dispatcher sets the strategy, protection checks it, dispatch returns a receipt, and revenue lands in the report.

  1. 1
    Set the strategy

    Write hours and power for peak-valley or demand.

  2. 2
    Pass protection

    Check SOC bounds and power caps. Out-of-limit plans are not sent.

  3. 3
    Keep the receipt

    The site returns success or the failure reason.

  4. 4
    Read execution

    Compare the execution log with the planned curve.

  5. 5
    Book revenue

    Energy and revenue by type go into reports. The split is a separate sheet.

Boundary

Operations and the ledger live here. Collection and invitations live next door

Storage operations covers how a site runs, how strategy is sent, how alarms close and how revenue is recorded. Protocols, work orders, invitations and bids each have a product.

This product owns

  • Multi-site control, topology and device monitoring
  • Charge and discharge strategy, protection limits and execution receipts
  • Alarm grading, suppression and risk scores
  • Execution and settlement records for demand response and frequency regulation
  • Energy reports, revenue by type and the split sheet
  • Battery health, strategy suggestions, revenue forecasts and draft operations reports

Grid dispatch signals come from the grid or the virtual power plant. After the split sheet is produced, the bank transfer happens in finance.

Getting started

Five steps to run the first site

A site and its devices come first, then topology and strategy, then reports.

Prepare before you start
  • 1Site name, address, rated power and capacity
  • 2Vendor and model for PCS, BMS and racks
  • 3Gate meter and tariff periods
  • 4Protection requirements such as SOC bounds and power caps
  • 5Revenue split ratios, if an owner or investor is involved

Historical energy can be backfilled into reports. A backfill does not replace the meter or the settlement statement.

  1. 1
    Create the site

    Enter the site and mark it under construction or operating.

    This step produces · Site record
  2. 2
    Attach devices and drivers

    File PCS, BMS and racks, then pick a driver and point map.

    This step produces · Device list
  3. 3
    Draw the topology

    Connect the gate meter, PCS, racks and gateway.

    This step produces · Topology
  4. 4
    Set strategy and protection

    Write a peak-valley or demand strategy and apply a protection template.

    This step produces · A strategy that can be sent
  5. 5
    Publish reports

    Once operating data exists, export energy and revenue.

    This step produces · Report files
Platform

Many sites, an audit trail, and export

Storage operations runs on MeetCarbon Cloud and shares organization and permissions with solar and the virtual power plant.

Many sites

One account watches many storage sites and compares them.

Multi-party split

Operator, owner and investor each get a line by ratio.

Audit trail

Strategy dispatch, control, alarm confirmation and export record who did it and when.

Export

Energy, revenue and the split sheet can be exported for reconciliation.

SaaS

Annual subscription. Published prices are on the pricing page and follow the contract.

Private deployment

Can be deployed in the customer environment. Implementation is listed separately on the pricing page.

FAQ

Where strategy, alarms and revenue stop

These are the lines customers check most often.

Who sends the strategy?

The dispatcher sets hours and power under dispatch strategy, then sends it after the protection check. AI strategy suggestions stay as suggestions and are not sent automatically. Every send has a receipt.

Does closing an alarm mean the work order is done?

Confirm, recover and close happen in storage safety alerts. Inspection work orders that span solar, charging and buildings live in smart operations. The two can be compared. Neither replaces the other.

Does the split sheet pay out automatically?

The split module builds a sheet for the operator, owner and investor by ratio. The bank transfer happens in finance. Storage operations does not start a payment.

Does an AI forecast guarantee revenue?

Battery health, strategy suggestions and revenue forecasts are labeled as forecasts or suggestions. The peak-valley sketch on this page only illustrates quantities. Actual revenue follows the meter, the tariff and the settlement statement.

How is this split from the virtual power plant?

The virtual power plant aggregates resources and handles invitations, bids and clearing. Storage operations records whether this site executed the event and writes the settlement into revenue. Grid instructions are not invented here.

Lay out strategy and revenue for one site first

Tell us rated power, tariff periods and who sends strategy today. We will walk through control, dispatch and reports in this structure.