Site file
The station, the point of connection and the four assets enter the site file.
Assets on the picture
PV, storage, charging and the grid tie appear on one operating picture.
Strategy sent
The day’s four parts are written down, red lines included.
Watch
Power is compared with the strategy. Deviation stays on this record.
Revenue structure
Charging, PV and storage are listed by structure. This page does not roll them into a return.
Alarm to work order
A limit breach opens a work order. The result returns to the day’s log.
One site, one operating picture
PV, storage, charging and the grid connection sit on one picture: how power moves, whether the strategies collide, and whether the revenue structure lines up. Generation, battery state and charging orders stay on their own operating pages.
See the PV ledger- 4
- Site assets
- 1
- Strategy record
- By structure
- Revenue view
- PV
- Storage
- Charging
- Grid tie
Four assets, one picture
The picture shows how they work together. Generation, battery state and charging orders stay on their own pages.
- PV operations
PV
Daytime generation enters site power and serves on-site load first.
Inverter status and generation are kept in PV operations.
- Storage operations
Storage
Charges or discharges with the strategy, balancing PV and charging.
State of charge, cycling and safety alarms stay in storage operations.
- Charging operations
Charging
Charger power enters the picture. A floor is agreed separately.
Orders and tariffs stay in charging operations.
- Energy management
Grid tie
Point-of-connection capacity and import or export sit on the picture.
End-use curves and electrical safety stay in energy management.
Four parts of the day, with the limit written on the strategy
The strategy changes by time of day. A part runs only when its conditions hold. The red line is checked before it is sent.
Self-use
PV output serves on-site load first.
Export stays inside the agreed point-of-connection capacity.
Charging floor
Inside the charging window, the floor comes first. The remainder can charge storage.
The agreed floor on public chargers stays out of any reduction.
Peak shave
Storage discharges on the peak and eases the point of connection.
Battery safety limits and the minimum state of charge come first.
Export the remainder
After on-site load falls, the remainder goes out under the grid agreement.
Stay inside the agreement. Do not force full output just to export.
The day stays on one operating log
The file, the strategy, the watch, the revenue structure and the work order land on this record, so you can check later whether the day followed the strategy.
The main chain finishes one site. The side rails keep the ledgers and the resource handoff
Operations move site by site. Specialist ledgers and virtual-power-plant plans stay on the same files.
Site overview
Power and status for PV, storage, charging and the grid tie on one picture.
Strategy record
The four parts of the day, the conditions and the red lines, checked before they are sent.
Revenue structure
Charging, PV and storage listed by structure, ready to match the specialist ledgers.
Alarms and work orders
Limit breaches and device faults become work orders. The result returns to the day’s log.
Specialist ledgers
Generation, battery state and charging orders stay in PV, storage and charging operations. This page cites those results.
Virtual power plant
The site can be reported as a flexible resource. Invitations, clearing and settlement stay on the virtual power plant.
Operations reads the picture. The owner reads the structure. The desk takes the alarm
Finance checks the revenue structure. Each role stays inside its own sites.
Site operations
Picture and strategy- Keep the asset file
- Check the strategy and the red lines
- See whether power followed the day’s parts
Investment operator
Revenue structure- Read charging, PV and storage by structure
- Match them to the specialist ledgers
- Leave the return calculation in the project contract
Duty desk
Alarms and work orders- Take limit-breach alarms
- Open a work order and follow it through
- Write the result back to the day’s log
Finance
Structure check- Take figures from the revenue structure
- Match them to the specialist bills
- Keep the share rules on the site file
This page keeps the picture and the strategy. The ledgers stay where they are
The microgrid puts one site’s assets, strategy and revenue structure together. The items below connect in.
- PV operations
PV generation
Inverters, generation and weak strings are kept in PV operations. The picture takes power.
- Storage operations
Storage state
State of charge, cycling and safety alarms stay in storage operations. The picture takes charge and discharge power.
- Charging operations
Charging orders
Connector status, orders and tariffs stay in charging operations. The picture takes charging power and the agreed floor.
- Energy management
Load curves
End-use electricity, statistics and electrical safety stay in energy management. The point-of-connection curve comes from there.
- IoT device management
Device access
Presence and collection for inverters, storage converters, chargers and meters go through IoT device management.
- Virtual power plant
Invitations and settlement
Invitations, bids, clearing, verification and settlement run on the virtual power plant. This page supplies the site run and the strategy record.
- Parking
Parking fees
Lot orders and monthly passes stay in parking. If the site includes parking, it is a line in the revenue structure. Tariffs are not set here.
Construction and return
Construction and the investment return stay in the project contract. This page supplies the operating record and the revenue structure.
Grid dispatch
Grid-tie and dispatch orders come from the grid side. This page runs the site strategy and files it. It does not issue orders to the grid.
Align these before the site is drawn as one picture
The picture, the strategy and the revenue structure live here. Ledgers and invitations stay where they are.
How does this split from PV, storage and charging operations?
This page puts PV, storage, charging and the grid tie of one site on a single operating picture, and records the strategy and the revenue structure. Generation stays in PV operations, battery state in storage operations, orders and tariffs in charging operations.
How does it split from the virtual power plant?
The site can be a flexible resource. Invitations, bidding, clearing, verification and settlement run on the virtual power plant. This page keeps the operating picture and the strategy record for that verification.
How does it split from energy management?
End-use electricity, statistics, reports and electrical safety stay in energy management. This page uses point-of-connection power to see whether the day’s strategy held.
Does this page state an investment return?
Construction and the return stay in the project contract. This page lists charging, PV and storage by structure, so they can be matched to the specialist ledgers.
Can we see the picture before automatic control is in place?
Yes. Register the four assets and the point of connection first. The picture shows the power that has been collected. A strategy can be confirmed by hand before it is sent. Automatic control opens per part after authorization and proving are in place.
See whether this site can sit on one picture
Tell us whether you have PV, storage and charging, and how many systems they sit in today. We will demo and say how far the picture can go.