MeetCarbon Cloud · Zero-carbon park

One park boundary, one ledger

Public facilities and in-scope enterprises sit on the same boundary, so accounting can be matched, indicators land on someone, and the path shows progress. Building line items stay on zero-carbon building, organisation inventories on carbon inventory, and factory application files on zero-carbon factory.

界Boundary
核Accounting
标Benchmark
径Path
企Enterprises
Product loop

From the park file to the application draft

The park path runs as file, accounting, benchmark, ranking, path and draft. The approval decision stays with the competent authority.

01

Park file

Draw the boundary and register public facilities, buildings and in-scope enterprises on one park file.

02

Park accounting

Roll up fuel, purchased electricity and heat, industrial processes and sinks inside the boundary. Each row can be traced to a source.

03

Indicator benchmark

Mandatory and guidance indicators stay in separate columns. Gaps land on a facility or an enterprise.

04

Enterprise ranking

In-scope enterprises are ordered by filing status and indicator status, so the committee can see who is aligned and who still owes a file.

05

Path tracking

Green power, retrofit and sinks keep stage progress. This page records the structure and does not roll it into a return rate.

06

Application draft

Boundary, accounting, indicators and the path are arranged as the application file structure. Review and approval stay with the competent authority.

Five dimensions

Boundary, accounting, benchmark, path, enterprises

The committee and the park company read the baseline, the gaps and the progress on one park ledger.

界

Boundary file

The boundary, public facilities, buildings and the enterprise list are fixed first, so later accounting and ranking share one method.

核

Park accounting

Fuel, purchased electricity and heat, industrial processes and sinks are listed by the boundary, each traceable to a source.

标

Indicator benchmark

Mandatory and guidance indicators are compared separately. Gaps land on a facility or an enterprise.

径

Neutrality path

Measures keep stage progress. The return calculation stays in the project contract.

企

Tenant enterprises

One file per enterprise shows filing and indicators. Organisation inventories and factory application files stay on their own products.

Core views

Boundary ledger, enterprise ranking, path progress

Three desks match what a park committee checks day to day. Figures on the cards are samples.

Park accounting · sample

Boundary ledger

Fuel, purchased electricity and heat, industrial processes and sinks are listed apart. Each row returns to a facility or an enterprise.

Boundary ledger
Sample
Fossil fuel
Public boiler house
Collected
Purchased electricity and heat
Boundary meter
Collected
Industrial processes
Sample enterprise A
To check
Sinks
Park planting
Listed apart
Tenant enterprises · sample

Enterprise ranking

Ordered by filing and indicator status. The committee sees who is aligned and who still owes a file. Instructions to enterprises stay with the committee.

Enterprise ranking
Sample
01Sample enterprise AAligned
02Sample enterprise BFiled
03Sample enterprise CTo complete
Neutrality path · sample

Path progress

Green power, retrofit and sinks keep a stage. This page records the structure and does not state an investment return.

Path progress
Sample
Green powerIn progress
Park company
RetrofitOpened
Public facilities
SinksTo register
Boundary planting
Product map

Eight capabilities along the park operating path

From the file to the report, work stays at park level. Building ledgers, organisation inventories and factory files open from the linked products.

Foundation

Park file and boundary

Draw the boundary and register public facilities, buildings and in-scope enterprises as the shared method for accounting and ranking.

Write down what the boundary covers and who is inside, so later tables can be matched.

  • Boundary and zones stay on the park file, and changes remain traceable.
  • Public facilities, roads and planting, and buildings are registered apart from building line items.
  • In-scope enterprises have their own list. Enterprises outside the boundary stay out of park accounting.
  • Boundary
  • Public facilities
  • Building list
  • Enterprise list
Sample park
Sample
Boundary
Public facilities
Boiler · lighting · services
Buildings
Totals; line items on building
In-scope enterprises
On the list
Core

Park accounting

Roll up fuel, purchased electricity and heat, industrial processes and sinks inside the boundary into a traceable park ledger.

The park ledger is listed by source, so it can be matched to building and enterprise ledgers.

  • Fossil fuel and purchased electricity and heat are collected inside the boundary.
  • Industrial processes include only sources already inside the boundary.
  • Sinks are their own row. Offset certificates stay in carbon assets.
  • Fuel
  • Purchased energy
  • Industrial processes
  • Sinks
Boundary ledger
Sample
Fossil fuel
Public boiler house
Collected
Purchased electricity and heat
Boundary meter
Collected
Industrial processes
Sample enterprise A
To check
Sinks
Park planting
Listed apart
Core

Indicator control

Mandatory and guidance indicators are watched separately. Gaps land on a facility or an enterprise.

A benchmark names the place that is not aligned. The park total is listed on its own, and the gap still lands on a facility or an enterprise.

  • Mandatory and guidance indicators stay in separate columns.
  • A gap can be opened down to a public facility or one enterprise.
  • Trends are kept by accounting period so they can be matched to the application draft.
  • Mandatory
  • Guidance
  • Gap location
  • Trend
Indicator columns
Sample
Mandatory
Boundary energy
Key enterprises
Guidance
Green transport
Sink register
Core

One file per enterprise

A carbon file for each in-scope enterprise, with filing status and indicator alignment.

The park reads the list and the status. The enterprise’s own organisation inventory is completed in carbon inventory.

  • Each file records scope, contact and filing period.
  • Ranking follows filing and indicator status for the committee to read.
  • Product footprints and factory application files link out and are not expanded here.
  • Enterprise file
  • Filing status
  • Indicator alignment
  • Ranking
Enterprise ranking
Sample
01Sample enterprise AAligned
02Sample enterprise BFiled
03Sample enterprise CTo complete
Core

Multi-building roll-up

Building energy and carbon totals enter the park ledger. Line items and quotas stay on zero-carbon building.

The park takes totals. Floors, departments and quotas stay on zero-carbon building.

  • Each building contributes only the total the park ledger needs.
  • Common areas and tenant buildings are listed apart.
  • When the method does not match, the check goes back to the building ledger. Line items are not edited on this page.
  • Building totals
  • Public facilities
  • Method check
Building roll-up
Sample
Service buildingTotal
Production hallTotal
Common areaListed apart
Core

Neutrality path

Green power, retrofit and sinks are registered by stage so the committee can see whether the path is moving.

The path records stage and owner. The return calculation stays in the project contract.

  • Measures are listed by type: green power, retrofit, sinks.
  • Each measure has a stage and an owner.
  • This page does not roll the path into an investment return or a revenue amount.
  • Measure list
  • Stage
  • Owner
Path progress
Sample
Green powerIn progress
Park company
RetrofitOpened
Public facilities
SinksTo register
Boundary planting
Linked work

Application draft

Boundary, accounting, indicators and the path are arranged as the application file structure for internal completeness.

The draft aligns the file structure. Review and approval stay with the competent authority.

  • The list covers four drafts: boundary, accounting, indicators and path.
  • Missing items are marked on the list before the filing window.
  • Versions are kept. An approval result is not produced on this page.
  • File list
  • Missing items
  • Versions
Application draft
Sample
Boundary noteComplete
LedgerComplete
Indicator checkOne missing
Path listComplete
Linked work

Park reports

Accounting, enterprise ranking and path progress are exported from the park boundary for internal briefings and filing preparation.

Reports come from the same park ledger as the three desks on this page.

  • The ledger is listed by source and can be traced.
  • Enterprise ranking matches the one-file status.
  • Path progress lists stages and does not list a return rate.
  • Ledger
  • Ranking
  • Path progress
This period
Sample
Boundary ledgerReady
Enterprise rankingReady
Path progressReady

See whether this park can sit on one boundary ledger

Tell us which public facilities and in-scope enterprises are inside the boundary. We arrange a trial or a demo and say how far the ledger can go.

Back to solutions