MeetCarbon Cloud · Zero-carbon factory

One factory, one ledger

Park authorities and site environment teams read gaps, path progress and materials on one ledger. The park ledger stays in zero-carbon parks. The organisation inventory stays in carbon inventory. This page records creation gaps and the materials list.

差Gaps
径Path
标Indicators
措Measures
材Files
Product loop

From the site file to the acceptance draft

The factory path runs as file, gaps, path, indicators, materials and draft. The approval decision stays with the competent authority.

01

Site file

Register the site, workshops and utilities on one factory file.

02

Admission gaps

List what is already in place and what is still missing against the creation clauses. Each row returns to the site.

03

Construction path

Gaps split into stages and measures. Completion stays on the path.

04

Indicator ledger

Connected indicators are listed by site. This page records the structure and does not state a reduction rate.

05

Materials list

The file, gaps, path and evidence are arranged as a materials list. This page does not state an approval.

06

Acceptance draft

The materials list maps onto the acceptance structure. Missing items stay on the list.

Five dimensions

File, gaps, path, indicators, draft

Park authorities and site environment teams read whether the boundary is clear, the gaps are complete, and the materials can be matched, on one factory ledger.

界

Site file

The site, workshops and utilities are fixed first, so later gaps and materials share one method.

差

Gap list

What is in place and what is still missing are listed by clause. Each row returns to the site.

径

Construction path

Gaps split into stages and measures. Progress stays on the path. Detail ledgers stay where they are.

标

Indicator ledger

Connected indicators are listed by site. Operating curves stay in energy management.

材

Materials draft

The file, gaps, path and evidence are arranged as a materials list for internal briefings and acceptance preparation.

Core screens

Gap list, path progress, materials list

Three desks match what an environment team checks day to day. Statuses on the cards are samples.

Gap list · sample

Gap list

Clauses are listed as in place or to-complete. Each row returns to the site.

Gap list
Sample
Sample workshop A
Sample factory
Collected
Utilities
Sample factory
Watching
Clause to complete
Sample factory
To complete
In place
Site
Listed apart
Path progress · sample

Path progress

Stages, measures and the current status stay apart. Measures not yet started stay to-complete.

Path progress
Sample
Stage 1Collected
MeasuresListed apart
Not startedTo complete
Materials list · sample

Materials list

File, gaps, indicators and evidence are listed apart. Missing items stay to-complete.

Materials list
Sample
Site fileCollected
Gap listWatching
Indicator ledgerListed apart
Acceptance draftTo complete
Capability map

Eight capabilities along the factory creation ledger

From the site file to the acceptance draft, work stays with one factory. Park rosters, the organisation inventory and distribution detail open from the linked products.

Foundation

Site and boundary

Register the boundary by site, workshop and utility, as the shared method for gaps and materials.

Write down which factory and which workshops are in scope, so later tables can be matched.

  • The site file records workshops and utilities, and changes remain traceable.
  • The factory site and park shared facilities are registered apart.
  • A multi-site group starts with one demonstration factory. The group comparison follows after that ledger is clear.
  • Site
  • Workshops
  • Utilities
  • Boundary
Sample factory
Sample
Site
Workshops
Production · support
Utilities
Power · utilities
Site
Boundary · file
Core

Admission gaps

List what is in place, in progress and still missing against the creation clauses, as a traceable gap list.

The list shows which materials this factory still lacks.

  • Each row has a site and a current collection status.
  • The organisation inventory is completed in carbon inventory. This page cites the result after it is inside the factory boundary.
  • This page records the gap structure and does not state an approval.
  • Clauses
  • In place
  • To complete
  • Gaps
Gap list
Sample
Sample workshop A
Sample factory
Collected
Utilities
Sample factory
Watching
Clause to complete
Sample factory
To complete
In place
Site
Listed apart
Core

Construction path

Split gaps into stages and measures, and track the current progress by factory.

The path shows how far each measure has gone.

  • Each measure has a stage and a current status.
  • Where targets are already broken down, this page cites progress after the measure code.
  • Measures not yet started stay to-complete.
  • Stage
  • Measure
  • Owner
  • Status
Path progress
Sample
Stage 1Collected
MeasuresListed apart
Not startedTo complete
Core

Indicator ledger

Connected factory indicators are listed by site. Key items can be opened by name.

The ledger shows which class of indicator is already collected.

  • Connected indicators are listed. Missing items stay on the list.
  • Operating curves and electrical safety stay in energy management. This page takes the totals.
  • This page records the structure and does not state a reduction rate.
  • Site
  • Indicator
  • Status
  • Missing
Indicator ledger
Sample
Connected
Site indicators
Listed apart
Missing
To complete
Curves in energy
Core

Measure tracking

Energy-saving, process and energy-mix measures are registered by name, as rows on the path.

The list records measures already opened. Implementation detail stays where it is.

  • Each measure has a factory and a current registration status.
  • Quantities and investment estimates are not expanded here.
  • Measures not yet registered stay on the list.
  • Name
  • Class
  • Period
  • To complete
Measure tracking
Sample
Opened
Collected
Progress on the path
Not listed
To complete
Detail stays put
Core

Evidence index

Map clauses, measures and materials to where the evidence sits, booked by factory.

The index keeps the evidence location. Source documents stay in the system they came from.

  • Each piece of evidence has a current collection status.
  • Raw metering curves are not expanded here.
  • Evidence not yet attached stays to-complete.
  • Clause
  • Evidence
  • Location
  • Listed apart
Evidence index
Sample
Clause evidenceListed apart
Raw curveIn energy
Not attachedTo complete
Linked work

Materials list

The site, gaps, path and evidence are arranged as the creation and briefing file list.

The list aligns the file structure. The approval decision stays with the competent authority.

  • The list covers the file, gaps, the path, indicators and the draft.
  • Missing items are marked before the filing window.
  • This page does not state a review score.
  • List
  • Missing items
  • Period
Materials list
Sample
Site fileCollected
Gap listWatching
Indicator ledgerListed apart
Acceptance draftTo complete
Linked work

Acceptance draft

The materials list maps onto the acceptance structure, from the same factory ledger as the three desks.

The draft comes from the same factory ledger. A formal disclosure, when needed, is completed in ESG.

  • The list covers the site, gaps, the path, indicators and materials.
  • Missing items stay on the list.
  • Public wording matches the three desks.
  • File list
  • Missing items
  • Draft
Materials list
Sample
Site fileCollected
Gap listWatching
Indicator ledgerListed apart
Acceptance draftTo complete

See whether this factory can sit on one ledger

Tell us the site, the workshops and the utilities already connected. We arrange a trial or a demo and say how far the ledger can go.

Back to solutions