MeetCarbon Cloud · Zero-carbon transport

One road corridor and fleet ledger

Road companies and transport groups read facilities, station energy and fleet consumption on one ledger. Service-area charging orders stay in charging operations, solar and storage enter as totals, and vehicle dispatch stays in the transport operations system.

路Corridor
站Stations
队Fleet
核Accounting
稿Draft
Product loop

From the corridor file to the disclosure draft

The transport path runs as file, stations, fleet, activity data, accounting and draft. The regulatory decision stays with the competent authority.

01

Corridor file

Register sections, service areas, toll stations and maintenance yards on one corridor file.

02

Station energy

Common areas, retail and logistics at service areas and toll stations are listed apart, each traceable to a facility.

03

Fleet ledger

The operator’s own vehicles are registered by energy type. Passing-vehicle charging and own-fleet charging stay in separate rows.

04

Activity data

Turnover stays on the ledger as a name in the accounting note. This page records the structure and does not state an intensity target.

05

Full accounting

Fuel, purchased electricity and fleet consumption are listed by source. Each row returns to a section or a station.

06

Disclosure draft

Corridor, stations, fleet and accounting are arranged as the disclosure file structure. The regulatory decision stays with the competent authority.

Five dimensions

Corridor, stations, fleet, accounting, draft

Energy staff and fleet managers read facilities, consumption and whether the draft is complete, on one transport ledger.

路

Corridor file

Sections, service areas, toll stations and maintenance yards are fixed first, so later energy and accounting share one method.

站

Station energy

Common areas, retail and logistics are listed apart. Charging orders and parking fees stay on their own products.

队

Fleet ledger

Energy type and consumption of the operator’s own vehicles have their own list. Dispatch and routes stay in the transport operations system.

核

Activity data

Turnover is written in the accounting note so it can be matched to fleet consumption. This page does not state an intensity target.

稿

Accounting draft

Fuel, purchased electricity, fleet consumption and green-power totals are listed apart for internal briefings and filing preparation.

Core screens

Corridor ledger, fleet and stations, accounting table

Three desks match what a road company checks day to day. Statuses on the cards are samples.

Corridor ledger · sample

Corridor ledger

Service areas, toll stations and maintenance yards are listed by section. Each row returns to a facility.

Corridor ledger
Sample
Sample service area A
Sample section
Collected
Toll station
Sample section
Watching
Maintenance yard
Sample section
To complete
Canopy solar
Service area A
Listed apart
Fleet and stations · sample

Fleet and stations

Own-fleet consumption and passing-vehicle charging stay apart. Order detail stays in charging operations.

Fleet and stations
Sample
Own fleetCollected
Passing-vehicle chargingListed apart
Maintenance machinesTo complete
Accounting table · sample

Accounting table

Fuel, purchased electricity, fleet consumption and green-power totals are listed apart. Each row returns to a section or a station.

Accounting table
Sample
Station fuelCollected
Purchased electricityWatching
Fleet consumptionTo check
Green-power totalListed apart
Capability map

Eight capabilities along the transport carbon ledger

From the corridor file to the disclosure draft, work stays with the transport operator. Charging orders, solar curves and parking fees open from the linked products.

Foundation

Corridor file and boundary

Register service areas, toll stations and maintenance yards by company, section and facility, as the shared method for energy and accounting.

Write down which sections and facilities are in scope, so later tables can be matched.

  • Sections and facilities stay on the corridor file, and changes remain traceable.
  • Service areas, toll stations and maintenance yards are registered apart from passing traffic.
  • A multi-section group starts with one demonstration section. Group comparison follows after that ledger is clear.
  • Road company
  • Sections
  • Service areas
  • Toll stations
Sample section
Sample
Corridor
Service areas
Common · retail · logistics
Toll stations
Station electricity
Maintenance yards
Machines and fuel
Core

Station energy

Common areas, retail and logistics at service areas and toll stations are collected by facility. Key circuits can be opened.

When the main meter rises, the ledger names whether it is common-area lighting, retail or logistics.

  • Electricity, water and gas are listed for meters already connected. Missing meters stay on a gap list.
  • Distribution curves and electrical safety stay in energy management. This page takes facility totals.
  • Parking fees and bay orders stay in smart parking. This page keeps the station list.
  • Common areas
  • Retail
  • Logistics
  • Missing meters
Station line items
Sample
Service area
Common lighting
Retail
Toll station
Station power
Logistics
Core

Corridor energy roll-up

Solar on slopes, canopies and service-area roofs, and storage, enter the transport ledger as facility totals.

The corridor ledger takes generation and consumption totals. Inverter curves and strategies stay on solar and microgrid.

  • Each energy facility has a section and a current collection status.
  • Self-use and purchased electricity are listed apart. Green certificates and offsets stay in carbon assets.
  • This page records totals and does not state a revenue amount.
  • Solar
  • Storage
  • Self-use
  • Purchased electricity
Corridor energy
Sample
Canopy solarCollected
StorageWatching
Purchased electricityListed apart
Core

Charging link

Service-area charging and battery swap enter as totals at the grid connection. Connector-level orders and settlement stay in charging operations.

Own-fleet charging and passing-vehicle charging are listed apart, so internal accounting can match them.

  • This page keeps energy and ownership. Orders, invoices and settlement are completed in charging operations.
  • Battery swap, once connected, also enters as a total. Orders are not expanded here.
  • Refuelling sites record the usage mix only. Site control stays in the station’s specialist system.
  • Grid connection
  • Own fleet
  • Passing vehicles
  • Totals
Charging totals
Sample
Own-fleet chargingListed apart
Passing vehiclesListed apart
Order detailIn charging
Core

Fleet and mobile sources

The operator’s own vehicles and maintenance machines are registered by energy type, as the fleet-side entry to activity data.

The fleet ledger shows who is on the list, which energy they use, and which section the consumption belongs to.

  • The vehicle file records energy type and operating scope. Consumption is collected by accounting period.
  • Maintenance and construction machines are their own rows, apart from passenger and freight vehicles.
  • Dispatch, routes and arrival times stay in the transport operations system. This page does not produce a dispatch suggestion.
  • Own vehicles
  • Energy type
  • Maintenance machines
  • Consumption
Fleet and stations
Sample
Own fleetCollected
Passing-vehicle chargingListed apart
Maintenance machinesTo complete
Core

Activity data

Turnover and similar activity data sit in the accounting note, so they can be matched to fleet consumption.

Activity data explains which business the consumption belongs to. This page does not state an intensity target.

  • Names such as turnover and trip count follow the statistics the operator already keeps.
  • Missing figures are marked on the list before the filing window.
  • Method changes keep a version, so they can be matched to the disclosure draft.
  • Turnover
  • Period
  • Match
  • Gaps
Activity data
Sample
TurnoverRegistered
TripsTo complete
PeriodThis period
Core

Full accounting

Roll up fuel, purchased electricity and fleet consumption for the transport operator into a traceable ledger.

The transport ledger is listed by source, so it can be matched to bills, fuel and the fleet file.

  • Station fuel and fleet fuel are collected apart.
  • Purchased electricity and corridor self-use are listed apart.
  • The organisation inventory is completed in carbon inventory. This page cites the result after it is inside the boundary.
  • Fuel
  • Purchased electricity
  • Fleet consumption
  • Green power
Accounting table
Sample
Station fuelCollected
Purchased electricityWatching
Fleet consumptionTo check
Green-power totalListed apart
Linked work

Disclosure draft and reports

Corridor, stations, fleet, activity data and accounting are arranged as the disclosure and briefing file structure.

The draft aligns the file structure. The regulatory decision stays with the competent authority.

  • The list covers five drafts: corridor, stations, fleet, activity data and accounting.
  • Missing items are marked on the list before the filing window.
  • Reports come from the same transport ledger as the three desks.
  • File list
  • Missing items
  • Transport reports
This period
Sample
Corridor ledgerReady
Fleet consumptionReady
Disclosure file listReady

See whether this corridor and fleet can sit on one ledger

Tell us which service areas, stations and own vehicles are on the section. We arrange a trial or a demo and say how far the ledger can go.

Back to solutions